Rose Stage 1

Ground Floor First Floor
Ground Floor First Floor

Access

Clarke double leaf acoustic shutter loading door with 4m wide x 5m high access

Acoustics

Soundproofing to achieve NR25

Rigging

Free-standing steel post and aluminium truss support rig with triangular aluminium truss perms at approximately 2m centres; Uniform distributed load capacity of 145kg per linear meter per perm (total capacity > 15 tonnes); Rigging access from below

HVAC

Air handling system for fresh air circulation, ventilation and pyrotechnic extract capable of up to 1.5 air changes per hour with heat recovery; Options available for comfort cooling and heating

FAQs

Can we use our own suppliers?

One of our key differentiators from the other studios in greater London is that we remain agnostic about which vendors and suppliers you hire for camera and lighting packages, catering, or anything else. We do not tack on fees either.

How will you work with us to adopt sustainability policies?

We ask all of our production clients to partner with us in committing to adopting sustainable production policies. Our Head of Sustainability works closely with HODs to inform them about options for waste reduction, recycling, and re-use. We can direct materials to community organizations given enough time for planning. Signage around campus will indicate where and how to recycling day-to-day materials, not to let vehicles idle, and temperature control in each building. We will capture as much data as possible for future reporting to albert.

Learn More

Do you have enough parking?

Yes! Despite being in central London, our location in the Park Royal industrial area means we have several acres of property that include lots for unit base or crew parking. In addition to serving the needs of our clients filming at Garden Studios, we offer unit base lots for crews filming around London as well.

Learn More